Geregu Power PLC (Phase I) Featured

Written by 

 

The Geregu plant is a 414MW gas plant (3 x 138MW, Open Cycle gas turbines) located in Geregu, near Ajaokuta in Kogi State. Its expected productivity is 90%. The plant was commissioned in 2007 and was meant to boost electricity generation in the country.

PRIVATIZATION

In 1999, the FGN began an aggressive restructuring of the power sector with several aims, including introduction of efficient, private sector standards and management principles, and methodology, leading to reliable power. 

In 2001, the FGN approved a National Electric Power Policy (NEPP), followed in 2005 by the Electric Power Sector Reform (EPSR) Act. EPSR Act provides the legal authority for the unbundling of Nigeria’s power utility as well as the introduction of a new, regulatory scheme managed by the Nigerian Electricity Regulatory Commission (NERC), an independent regulatory commission, to guarantee open access and ensure efficiency throughout the industry. 

 

Outright sale option was adopted by the Bureau for Public Enterprises in the sale of Geregu phase I which was culminated on the 1st of November 2013. The new owners are Amperion Power Ltd.

Read 3314 times

1 Comment

  • Comment Link Salau wale david Monday, 03 July 2017 15:26 posted by Salau wale david

    Gm PLC
    Nigeria.





    Good afternoon fathers and friends,

    The purpose of this letter is to say well done to the industry ,and know where more helping hand may be needed in the sector.
    I will be happy if area of generation that need to be waken up can be sent to me for proper action and reawakening/rehabilitation.

    Yours faithfully,
    Salau olawale David.

    Report

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.



Anti-spam: complete the taskJoomla CAPTCHA