Disco Ranking
Abuja Electricity Distribution 9
Benin Electricity Distribution 6
Eko Electricity Distribution 2
Enugu Electricity Distribution 11
Ibadan Electricity Distribution 3
Ikeja Electricity Distribution 1
Jos Electricity Distribution 10
Kaduna Electricity Distribution 4
Kano Electricity Distribution 7
Port Harcourt Electricity Distribution 8
Yola Electricity Distribution 5

IWIN Editorials


Daily Energy Watch

29-05-2020 30-05-2020
Available Generation Capability MW 7542.40 7709.90
Peak Generation MW 4092.50 4897.00
Average Generation MW 3527.88 3774.96
Generation Constraint due to Gas MW 1520.00 1559.00
Generation Constraint due to Water MW 240.00 160.00
Generation Constraint Due to Load Rejection MW 1859.00 1509.00
Generation Constraint Due to Transmission MW 171.20 42.70
Total Constrained Generation MW 3790.20 3270.70
Available Generation Capability MW 6014.40 5883.20
Peak Generation MW 5295.70 4827.70
Average Generation MW 4227.48 4160.42
Generation Constraint due to Gas MW 0.00 0.00
Generation Constraint due to Water MW 292.00 290.00
Generation Constraint Due to Load Rejection MW 1579.60 1882.70
Generation Constraint Due to Transmission MW 230.00 120.00
Total Constrained Generation MW 2101.60 2292.70